LEED v4 BD+C e ID+C | |
SSc Heat Island Reduction – Option1 | – |
MRc BPDO – EPD Option1 | ✓ |
MRc BPDO Sourcing of Raw Materials – Option 2 |
– |
MRc BPDO Material Ingredients – Option 2 |
✓ |
EQc Low – Emitting materials | – |
LEED v4.1 BD+C e ID+C | |
SSc Heat Island Reduction – Option 1 | – |
MRc EPD – Option1 | ✓ |
MRc Sourcing of Raw Materials | – |
MRc Material Ingredients Option 2 | ✓ |
EQc Low – Emitting materials | – |
WELL v2 | |
X01.1 Material Restrictions Restrict Asbestos |
✓ |
X02.1 Interior Hazardous Materials Management Manage Asbestos Hazards |
– |
X01.3 Material Restrictions Restrict Lead |
✓ |
X05.2 Enhanced Material Restrictions Part 2 Select Compliant Architectural And Interior Product |
– |
X06 VOC Restrictions | – |
X08.1 Materials Optimization – Select Materials With Enhanced Chemical Restrictions option 1 | ✓ |